FOR LEASE OR SALE -INDUSTRIAL BUILDING / TURNKEY CULTIVATION FACILITY INCLUDES MICRO CUP, BOP, AND EQUIPMENT. SELLER FINANCING AVAILABLE 

Cultivation Turnkey Improvements • Currently configured at 83 grow lights. It could be more with an alternative configuration. eg Double rack system with LED or mixed HPS. NanoLux 1000 DE / Units 48 / Cost $400 = $19,200.00 Phantom 1000w HPS / Units 33 / Cost $400 = $13,200.00 Quest 205/225 dehumidifier / Units 7 / Cost $3,500 = $24,500.00 5 tons of HVAC units and blowers / Units 7 / Cost $7,500 = $52,500.00 6 full spectrum LED grow light / Units 6 / Cost $500 = $300.00 1 American Classic safe / Units 1 / Cost $250 = $250.00 UL certified security system with w/24 hr call analytics / equipment and installation / $18,000.00 ADA Restroom – Completed / $5,000.00 ADA Entry Ramp / $5,000.00 Wrought Iron Fencing / $25,000.00 $165,650.00 Of Turnkey Equipment and approximately $500,000.00 in facility buildout.

• BOP And State License • The facility has been approved with a class A specialty indoor license of up to 5,000 SF. Currently has BOP and State license and city license.

• Cultivation Facility Buildout • Four cultivation rooms, a dry room, a security room, approved buildout, 400 AMPS. An additional approximately 600 square-foot drying room at the mezzanine level. • District 2, Area 4 • Micro Conditional Use Permit to allow cannabis production (cultivation, manufacturing, and distribution) within an existing warehouse building. Light Industrial Special Planning District (M-1- SPD) zone in the Del Paso Boulevard/Arden Way SPD; and Site Plan and Design Review for minor exterior alterations to an existing building on 0.16 acres within the Light Industrial Special Planning District (M-1-SPD) zone in North Sacramento Design Review District

 

You need to setup the Yelp Fusion API.

Go into Admin > Real Estate 7 Options > What's Nearby? > Create App

Location